TCES Group Latest News & Events

24 Nov 2017

Anti-Bullying poster competition winners announced

A huge thank you to every pupil who submitted an entry to our Anti-Bullying poster competition and to the staff for encouraging such a focus on these key anti-bullying messages. Last year the standard was so high that we thought it would be a struggle to equal the quality of the entries – how wrong we were! The pupils have surpassed our expectations once again. The quality of the artwork alongside some very heartfelt and hard-hitting messages has been overwhelming and all of the pupils should be very proud.

To judge this competition, all of the posters were anonymised so the judges didn’t know which pupil produced each poster or which school they came from. We felt that this was the fairest way to judge them for all pupils. But there must be some winners and again, through much deliberation, the judges have agreed on the following:

1st place: Steven EFS

2nd place: Joshua EFS 

 

 

 

 

 

 

 

 

3rd place: Jubayer Create London

 

4th place: Ethan EFS

As usual there were far too many amazing posters to keep to just 4 prizes, so the following posters will also be turned into professional posters and will be displayed in every school:

Tia: NWLIS

Chase: EFS

Kody: EFS

All of the above pupils will have an A3-sized poster produced to take home with them. The posters will also be displayed in each school and Create Service hub.



20 Nov 2017

16 Nov 2017

16 November: Stratford Marsh school building update. You’ll see from the photo above how smart the new school looks! The front porch entrance has a new roof, and inside what was once a church we now have a ground and first floor. The image of the construction worker with the trestle table stands where a new school hall will be. The walls inside are now plastered; the air conditioning installation is almost complete and the skirting boards are in place. 

Work is set for completion around spring next year, when Stratford Marsh pupils will be moved back into the school from their temporary residence at Custom House.




18 Nov 2017

2 Nov 2017

The past few months have seen many changes to the Stratford Marsh new build, where work continues at a swift pace and is set to be completed on schedule (around Easter time).

The building’s exterior, which previously stood as a church, gives the illusion of readiness with its smooth freshly painted cream walls. The car park directly outside the school has been newly tarmacked, with the added installation of a circular flower bed ready for planting.

Inside the building, we now have a school hall, sensory room and five classrooms plus a bathroom, with access to the main school to the rear of the building. The first floor is now in place, with seven classrooms and a bathroom.

The building is now structurally sound, with plumbing connected. Building contractors Glorcroft are now working on air conditioning installation, electrical wiring and wall plastering. Once complete, this will provide East London Independent School’s expanded Stratford Marsh site with ample space, plus the addition of a sensory room allowing pupils with autism to develop and engage their senses in a stimulating environment.

Above, the newly tarmacked car park and flower bed

Above & Right, corridor, ground floor



17 Nov 2017

18 August 2017

18 August – development continues at TCES Group’s Stratford Marsh school, which is currently being transformed into a much larger site!

The church hall, located to the left of the current main school building, now has the second level constructed, with sound proofing, flooring and insulation also being installed. The downstairs will house a school hall and there will be additional classrooms and toilet facilities. 

The image directly below shows the flooring in place on the newly constructed second floor.

    



16 Nov 2017

Create Essex pupils record song for Anti-Bullying Week!

This week is Anti-Bullying Week, and to raise awareness Create Essex pupils have been busy recording this song. Originally featured on ‘Britain’s Got Talent’ two years ago, the pupils edited the verse to suit their anti-bullying brief. The music was downloaded and recorded at the Create Essex hub by the music teacher. The pupils who sang on this recording were: 

  • Pypa 
  • Coco 
  • Tyn   and
  • Oliver 


16 Nov 2017

26 May 2017

Those of you who have visited Stratford Marsh will be aware of the pre-existing church that stands to the left of the school. Now the exciting  third phase of redevelopment – transforming the church hall into a new part of the school – commences on 30 May 2017.

The first duty for our contractors  is to seal off the building area from the rest of the school, with all existing fencing that can be looked through boarded up. Temporary construction buildings will be built adjacent to the school playground, with the most notable change being the construction of a high wall that will run next to the car park.

Below are photos of the church, taken on Wednesday  24 May, just before building work commences. We’ll be reporting on the transformation from church to school building throughout it’s progression. 

    



16 Nov 2017

New build update: Stratford Marsh

16 November: Stratford Marsh school building update. You’ll see from the photo above how smart the new school looks! The front porch entrance has a new roof, and inside what was once a church we now have a ground and first floor. The image of the construction worker with the trestle table stands where a new school hall will be. The walls inside are now plastered; the air conditioning installation is almost complete and the skirting boards are in place. 

Work is set for completion around spring next year, when Stratford Marsh pupils will be moved back into the school from their temporary residence at Custom House.

 



15 Nov 2017

Essex Fresh Start School feature in Essex Wildlife Trust magazine

Lucy Willis, Outdoor Learning Officer at Forest Schools, has been working closely with pupils from Essex Fresh Start School in Witham in a series of outdoor learning sessions called ‘Wild Wednesdays.’ Each session allows up to 10 pupils the chance to experience a variety of outdoor activities in all types of weather, ranging from outdoor cooking to planting trees and building a bug hotel.

Forest Schools provide a unique approach to outdoor play and learning by ‘encouraging and inspiring individuals of any age through positive outdoor experiences.’

Essex Fresh Start featured in Essex Wildlife Trust magazine about their collaboration with Forest Schools. You can read the article here: Forest School article

For more information about Forest Schools, or to find your nearest school, please:       visit using the link here      



03 Nov 2017

Black History Month Competition: Overall Winners

We were delighted to receive so many entries from pupils,
parents/carers and staff, expressing their support and reflecting upon their own journeys in relation to Black History Month irrespective of their background. Their contributions are also linked into their own creative feelings and aspirations about both celebrating the goal of inclusivity whilst acknowledging the strength of diversity.

For the first time ever, TCES Group decided to open the competition to not only pupils and staff, but parents also. While all winning entries have been published in our TCES Group Poetry Book (which has just gone to print), the overall winners, and their poems, are listed below:

Pupil
Shane, Create Essex Shane

Staff
Ms. Medley, NWLIS  My Brown Skin
ANON, Create Essex  Anon

Parent
ANON, East London The strength of a father

 

 

 



02 Nov 2017

November update: Stratford Marsh redevelopment

The past few months have seen many changes to the Stratford Marsh new build, where work continues at a swift pace and is set to be completed on schedule (around Easter time).
The building’s exterior, which previously stood as a church, gives the illusion of readiness with its smooth freshly painted cream walls. The car park directly outside the school has been newly tarmacked, with the added installation of a circular flower bed ready for planting.
Inside the building, we now have a school hall, sensory room and five classrooms plus a bathroom, with access to the main school to the rear of the building. The first floor is now in place, with seven classrooms and a bathroom.
The building is now structurally sound, with plumbing connected. Building contactors Glorcroft are now working on air conditioning installation, electrical wiring and wall plastering.
Once complete, this will provide East London Independent School’s expanded Stratford Marsh site with ample space, plus the addition of a sensory room allowing pupils with autism to develop and engage their senses in a stimulating environment.

Above, the newly tarmacked car park and flower bed

Above & below, corridor, ground floor

New classroom, first floor